What should be in a deck quote or contract?

Updated September 30, 2026 · 7 min read · Written by the DeckDebut team

A proper deck quote specifies the structure (footings, joist spacing, beam sizing, ledger and flashing), the materials by brand, line and colour, the scope including what is excluded, a payment schedule tied to milestones, the permit responsibility, and a written warranty separating labour from manufacturer coverage.

A one-page quote saying "Build 12×16 composite deck — $14,500" is not a quote. It is a number with a sentence attached, and every disagreement you have later will be about something it did not say.

Here is what a real one contains. Use it as a checklist against whatever you have been handed.

The structure

This is the part you are really buying, and the part most quotes are thinnest on:

  • Footing type, diameter and depth — poured concrete piers, helical piles, or precast blocks.
  • Post size and spacing.
  • Beam dimensions and how beams attach to posts.
  • Joist size and spacing on centre — and confirmation it matches what your decking requires.
  • How the deck attaches to the house: ledger board, fastener type and pattern, and flashing method.
  • Hardware: joist hangers, structural screws, and whether they are rated for treated lumber.

The materials

  • Decking: brand, product line, colour, and board width. "Composite" alone is not a specification.
  • Railing: system, infill type, post style, and finish colour.
  • Fascia and riser boards: matching material, or noted as omitted.
  • Fastening: hidden clips or face screws, and the brand.
  • Substructure lumber: treated grade and species.

Scope — including what is not included

Exclusions matter more than inclusions, because that is where surprise invoices come from. Look for an explicit position on each of these:

  • Demolition and disposal of an existing deck.
  • Grading, drainage, retaining, or landscaping repair.
  • Electrical — outlets, lighting, hot tub circuits.
  • Permit fees and who pulls them.
  • Tree protection, or working around a protected tree.
  • Site access, and who moves what.
  • Clean-up and haul-away of construction waste.

The payment schedule

This is where homeowners lose money, and the rule is simple: payments should follow work, not precede it. A reasonable schedule looks roughly like this:

StageTypical shareWhat has happened
Deposit10–30%Contract signed, materials ordered, slot booked
Framing complete30–40%Footings in, structure up, framing inspection passed
Decking and railing on20–30%Surface and railing installed
Final10–20%Punch list cleared, final inspection passed, site clean
Proportions vary. The shape — small deposit, money following milestones — should not.

Hold a final payment that is large enough to matter. The last ten per cent is what gets the punch list finished.

The terms worth reading twice

  • Warranty, split in two. Manufacturer warranty covers the boards; the builder's labour warranty covers the workmanship. They are different lengths and different companies. Get both in writing.
  • Change orders. How changes are priced and approved. "We will sort it out" becomes an invoice.
  • Schedule. A start window and a duration, with what happens if either slips badly.
  • Lien waivers. A supplier or subcontractor the builder fails to pay can place a lien on your property. Waivers on payment protect you from paying twice.
  • Insurance. Named coverage and limits, with a certificate you can verify with the insurer directly.
  • Cancellation. What it costs to walk away, and when.

Before you sign

  • Check the business name on the contract matches the one you vetted and the one on the insurance certificate.
  • Confirm the specification matches what you discussed — not what you remember discussing.
  • Make sure the permit responsibility is stated, not implied.
  • Take dated photographs of the site before work starts.
  • Keep every change in writing, including ones agreed on site.

Common questions

How much deposit is normal for a deck?
Commonly 10–30%, enough to cover materials and secure the slot. Half or more up front, before anything is ordered, is worth pushing back on.
Should a deck quote be itemised?
It should at minimum specify structure, materials and scope separately. A fully line-itemised cost breakdown is less common and not unreasonable to ask for, but a builder declining to show their margin is not a red flag on its own.
What warranty should a deck come with?
Manufacturer warranties on capped composite and PVC commonly run 25–50 years on the boards. Builder labour warranties are usually one to five years. Both should be written down.
Who pulls the permit, me or the builder?
Normally the builder, and the contract should say so. Be cautious if you are asked to pull it yourself — a permit in your name can shift responsibility for code compliance onto you.
What if the builder wants cash?
A discount for cash is common and not automatically sinister, but you lose the paper trail and any card protection. Never pay cash without a written, signed receipt against the contract.