A proper deck quote specifies the structure (footings, joist spacing, beam sizing, ledger and flashing), the materials by brand, line and colour, the scope including what is excluded, a payment schedule tied to milestones, the permit responsibility, and a written warranty separating labour from manufacturer coverage.
A one-page quote saying "Build 12×16 composite deck — $14,500" is not a quote. It is a number with a sentence attached, and every disagreement you have later will be about something it did not say.
Here is what a real one contains. Use it as a checklist against whatever you have been handed.
The structure
This is the part you are really buying, and the part most quotes are thinnest on:
- Footing type, diameter and depth — poured concrete piers, helical piles, or precast blocks.
- Post size and spacing.
- Beam dimensions and how beams attach to posts.
- Joist size and spacing on centre — and confirmation it matches what your decking requires.
- How the deck attaches to the house: ledger board, fastener type and pattern, and flashing method.
- Hardware: joist hangers, structural screws, and whether they are rated for treated lumber.
The materials
- Decking: brand, product line, colour, and board width. "Composite" alone is not a specification.
- Railing: system, infill type, post style, and finish colour.
- Fascia and riser boards: matching material, or noted as omitted.
- Fastening: hidden clips or face screws, and the brand.
- Substructure lumber: treated grade and species.
Scope — including what is not included
Exclusions matter more than inclusions, because that is where surprise invoices come from. Look for an explicit position on each of these:
- Demolition and disposal of an existing deck.
- Grading, drainage, retaining, or landscaping repair.
- Electrical — outlets, lighting, hot tub circuits.
- Permit fees and who pulls them.
- Tree protection, or working around a protected tree.
- Site access, and who moves what.
- Clean-up and haul-away of construction waste.
The payment schedule
This is where homeowners lose money, and the rule is simple: payments should follow work, not precede it. A reasonable schedule looks roughly like this:
| Stage | Typical share | What has happened |
|---|---|---|
| Deposit | 10–30% | Contract signed, materials ordered, slot booked |
| Framing complete | 30–40% | Footings in, structure up, framing inspection passed |
| Decking and railing on | 20–30% | Surface and railing installed |
| Final | 10–20% | Punch list cleared, final inspection passed, site clean |
Hold a final payment that is large enough to matter. The last ten per cent is what gets the punch list finished.
The terms worth reading twice
- Warranty, split in two. Manufacturer warranty covers the boards; the builder's labour warranty covers the workmanship. They are different lengths and different companies. Get both in writing.
- Change orders. How changes are priced and approved. "We will sort it out" becomes an invoice.
- Schedule. A start window and a duration, with what happens if either slips badly.
- Lien waivers. A supplier or subcontractor the builder fails to pay can place a lien on your property. Waivers on payment protect you from paying twice.
- Insurance. Named coverage and limits, with a certificate you can verify with the insurer directly.
- Cancellation. What it costs to walk away, and when.
Before you sign
- Check the business name on the contract matches the one you vetted and the one on the insurance certificate.
- Confirm the specification matches what you discussed — not what you remember discussing.
- Make sure the permit responsibility is stated, not implied.
- Take dated photographs of the site before work starts.
- Keep every change in writing, including ones agreed on site.
Common questions
- How much deposit is normal for a deck?
- Commonly 10–30%, enough to cover materials and secure the slot. Half or more up front, before anything is ordered, is worth pushing back on.
- Should a deck quote be itemised?
- It should at minimum specify structure, materials and scope separately. A fully line-itemised cost breakdown is less common and not unreasonable to ask for, but a builder declining to show their margin is not a red flag on its own.
- What warranty should a deck come with?
- Manufacturer warranties on capped composite and PVC commonly run 25–50 years on the boards. Builder labour warranties are usually one to five years. Both should be written down.
- Who pulls the permit, me or the builder?
- Normally the builder, and the contract should say so. Be cautious if you are asked to pull it yourself — a permit in your name can shift responsibility for code compliance onto you.
- What if the builder wants cash?
- A discount for cash is common and not automatically sinister, but you lose the paper trail and any card protection. Never pay cash without a written, signed receipt against the contract.